Friday, July 3, 2015

Condition of mooring lines

[taken from an email by John Halas (EMI, Inc) dated July 3, 2015.]

I am still trying to get some detailed feedback from the individuals at Calabash and South Water Caye on the condition of the mooring lines. I did hear from James  Azueta that he talked to the individual at SW Caye and he said that the ropes needed to be replaced. I am now trying to determine if the complete back up system is still there and available and the "extra" 1" nylon rope is still there and available.